Epoxy Floor pre-construction requirements
■Author: yuhua     ■Time:2019-3-20

Construction on the correct understanding and grasp of the ground surface preparation, the epoxy floor project is an important quality assurance. Its primary step is to get a number of ways to Ping and relevant information, including concrete water vapor content of the test data, concrete and pollution in the types of pollutants, pollution depth and concrete performance report. Chinese experts said epoxy resin industry associations, in order to fully grasp the concrete floor, on the basis of this communication of the full customs, and to develop science and ground-based treatment options. This epoxy floor for the entire project, provided an important quality assurance.

       Epoxy Floor general industrial coating on the ground-based requirements and treatment options, as the ground surface is the first request. According to Chinese Association of epoxy resin industry experts, including: cement-based solid surface, solid, can not afford to shell to prevent mortar shell from the phenomenon, the best concrete layer and the leveling of the mortar pouring together, if the first layer of concrete demands chopped mortar layer The thickness of not less than 4 cm, forklifts, requires some more thick; can not afford to sand the surface, hardness, and not the phenomenon of cement powder to high-quality cement, new layer of cement mortar inverted full maintenance; cement-based surface smooth, without Tuao injustice, Ma cellular surface, cement lump; ground formation of not more than coating thickness requirements (with 3; metres ruler-on); Dry surface, the water content of less than 6 percent, keeping the floor dry no oil pollution, cement ground after the maintenance period of five days before the venue construction, water can not wash or mop trailer; floor surface; values should be 6.0 to 8.0; ground without Oil pollution, other paint, latex paint, Paopao Tang, and other residues; slope should be consistent with the design requirements, allowing for the deviation of the gradient of 2 percent and not more than 30 mm. After construction is the base of inspection and preparation, compressive strength measurements, adhesive strength identification, measurement of surface wet, climate understanding of the environment, environmental temperature (temperature) to understand.